MILITECH PRE-ACTION REPORT · BLOODHOUND   //   ARCHIVE REF: BLOODHOUND/PRE   //   FOURTH CORPORATE WAR · 2023   //   TASK FORCE: MSTF-9 · NAPOLEON   //   CLASSIFIED · COMPARTMENTED   //   PHASE: PRE-DEPLOYMENT   //   THEATRE: BELÉM, BRAZIL   //   LAUNCH PLATFORM: USS JUDAS   //   ATTRIBUTION: DENIABLEMILITECH PRE-ACTION REPORT · BLOODHOUND   //   ARCHIVE REF: BLOODHOUND/PRE   //   FOURTH CORPORATE WAR · 2023   //   TASK FORCE: MSTF-9 · NAPOLEON   //   CLASSIFIED · COMPARTMENTED   //   PHASE: PRE-DEPLOYMENT   //   THEATRE: BELÉM, BRAZIL   //   LAUNCH PLATFORM: USS JUDAS   //   ATTRIBUTION: DENIABLE
M
MILITECH
ARCHIVED PRE-ACTION REPORT
SYSTEM TIME--:--:--
ARCHIVE OPEN
REFBLOODHOUND/PRE
PHASEPRE-DEPLOYMENT
PAGES11
CLASSCOMPARTMENTED
// ARCHIVED MILITECH PRE-ACTION REPORT · FOURTH CORPORATE WAR · 2023 · ARCHIVE REF BLOODHOUND/PRE
OPERATION BLOODHOUND
FOURTH CORPORATE WAR-ERA OPERATION (2023) · ARCHIVED · MSTF-9 “NAPOLEON” · LAUNCH PLATFORM: USS JUDAS
ARCHIVE REF: BLOODHOUND/PREPRE-DEPLOYMENTCLASSIFIED · COMPARTMENTED
◉Archived Militech pre-action report for Operation BLOODHOUND — a Fourth Corporate War-era tasking, filed 2023. The operation is long concluded; this is the historical planning record only and contains no operational outcome. The after-action report (BLOODHOUND/POST) is filed separately and is fully classified. Use the document navigation to read each section.
MILITECH ARCHIVE // BLOODHOUND/PRE · PRE-ACTION REPORTCLASSIFIED · COMPARTMENTED · PRE-DEPLOYMENT
PRE-DEPLOYMENT
SECTION 01 // EXECUTIVE SUMMARY
Executive Summary

Operation BLOODHOUND is a deniable direct-action tasking against Arasaka’s covert maritime presence in the port of Belém, northern Brazil. The operation stages from USS Judas and is executed by Militech Secret Task Force 9 (MSTF-9), callsign NAPOLEON.

The objective of BLOODHOUND is the destruction of Arasaka’s concealed submarine pen on the Belém coast and the Arasaka submarines berthed within it, together with the port logistics that support them. The operation opens with a preparatory strike on Arasaka-aligned power infrastructure to induce a blackout and degrade local control; this is a shaping move, not the objective. Under cover of the disruption the task force inserts, fights through to the concealed facility, and demolishes the pen and its submarines.

Arasaka response capability in theatre is assessed as significant but containable. Militech attribution must be prevented under all conditions. The task force recovers by AV to USS Judas on completion; no uniformed Militech recovery will follow them into theatre.

OPERATIONBLOODHOUND
TASK FORCEMSTF-9 · NAPOLEON
LAUNCH PLATFORMUSS JUDAS
THEATREBelém, Brazil
CLASSIFICATIONCLASSIFIED · COMPARTMENTED
ATTRIBUTION RISKEXTREME
RECOVERYAV to USS Judas
ERAFourth Corporate War · 2023
RECORD STATUSArchived / historical
BLOODHOUND/PRE · PAGE 01
PRE-DEPLOYMENT
SECTION 02 // THEATRE
Theatre of Operations

Theatre is the port of Belém and its coastal approaches, at the mouth of the Amazon. The city is poor, dense, and humid, built along the waterfront — river traffic, contract dock labour, and private maritime security operating with little local oversight.

Militech assesses that Arasaka is running Belém as a covert maritime hub behind civilian port cover — restricted cargo movement, submarine support, and private security. Public port infrastructure masks a concealed submarine pen built into the coast: the operation’s objective.

ASSESSED IN THEATRECHARACTER
Arasaka-aligned power infrastructureFeeds Arasaka-controlled districts — opening-strike target (blackout)
Arasaka-aligned port logisticsRestricted cargo movement under civilian cover
Concealed submarine penSubmarine support — coastal cliff / cave — PRIMARY OBJECTIVE
Local militant cellsAnti-Arasaka — fragmented, uncommanded (PROBABLE)
OBJECTIVE AREABelém, Brazil (port estate)
ARASAKA POSTURECovert maritime / logistics hub
LOCAL MILITANT RESPONSEPROBABLE
ENVIRONMENTTropical port / coastal cliff
BLOODHOUND/PRE · PAGE 02
PRE-DEPLOYMENT
SECTION 03 // STRATEGIC INTENT
Strategic Intent

BLOODHOUND is intended to remove Arasaka’s covert submarine capability staging out of Belém by destroying the concealed pen and the submarines within it, while keeping Militech involvement deniable.

The opening strike on power infrastructure is a shaping move: it plunges Arasaka-controlled districts into a blackout, degrades local command and security response, and creates the disruption the task force needs to reach the coast and breach the facility. Militech assesses that anti-Arasaka militant cells will exploit the same blackout, adding noise that further covers the task force’s movement — a low-attribution model in which Militech’s direct footprint is minimal and brief.

Local militant response is assessed as probable and, within limits, favourable to cover. Escalation beyond planned thresholds is assessed LOW. Wider second-order consequences are carried as [REDACTED].

OBJECTIVEDestroy the pen + berthed submarines
POWER STRIKEShaping move · blackout for cover
MILITECH FOOTPRINTMinimal · deniable
ESCALATION BEYOND THRESHOLDAssessed LOW
BLOODHOUND/PRE · PAGE 03
PRE-DEPLOYMENT
SECTION 04 // TARGETS
Targets

Primary target is the concealed Arasaka submarine pen on the Belém coast — a covert submarine-support installation built into the cliff / cave system — and the Arasaka submarines berthed within it. The intent is the structural collapse of the pen and the destruction of the submarines and support assets inside. A possible strategic weapons platform has been reported aboard one submarine; strategic-weapons capability is reported but unverified.

Preparatory target is Arasaka-aligned power infrastructure feeding controlled districts of Belém. Its demolition opens the operation: it induces a blackout to degrade local control and cover the task force’s movement to the coast. It is a shaping objective — the operation does not end with the power strike.

PRIMARY TARGETArasaka submarine pen + berthed submarines
PREPARATORY TARGETArasaka power infrastructure (blackout)
FACILITY TYPEConcealed submarine pen — cliff / cave
ASSETS WITHINArasaka submarines + support
STRATEGIC PLATFORM ABOARDREPORTED / UNVERIFIED
BLOODHOUND/PRE · PAGE 04
PRE-DEPLOYMENT
SECTION 05 // LAUNCH PLATFORM
Launch Platform — USS Judas

Operation BLOODHOUND stages from USS Judas, a Militech aircraft carrier serving as the launch and command platform for the tasking. USS Judas houses MSTF-9, the AV flight, mission command, demolition stores, supplies, and the communications relay prior to insertion. (USS Judas remains in active service as a standard fleet carrier.)

USS Judas will maintain black-position status outside confirmed hostile maritime lanes. All task-force deployment records are to remain compartmentalized. In the event of theatre compromise, USS Judas is not authorized to confirm operational linkage to MSTF-9.

The operation’s demolition stores were moved forward under a restricted logistics movement — notice bundle NC-MB-04/V44, loaded at NorCal docks (see Attachments).

VESSELROLE
USS JudasAircraft carrier — launch & command platform; houses MSTF-9, AV flight, demolition stores (NC-MB-04/V44)
MNS Carthage BellMedical / casualty support (tail)
MNS Red KingMunitions / ordnance handling (tail)
MNS Black CurrentRecon / low-signature support (tail)
One platform committed to the operational phase (USS Judas). Supporting vessels are tail elements and do not enter the objective area.
BLOODHOUND/PRE · PAGE 05
PRE-DEPLOYMENT
SECTION 06 // TASK ORGANISATION
Task Organisation — MSTF-9 “Napoleon”

The operational element is Militech Secret Task Force 9 (MSTF-9), callsign NAPOLEON, identified by animal callsign. Member identities are sealed in this report. Command is JACKAL.

A compartmented mission addendum applies to one operator (SHARK); its content is restricted to command-level review and is not reproduced here.

CALLSIGNROLEIDENTITY
JACKALField command / planning██████ [SEALED]
BOARBreach / close assault██████ [SEALED]
DOGSecond / close protection██████ [SEALED]
HAREScout / local interface██████ [SEALED]
DUCKVehicle & technical / demolition support██████ [SEALED]
GORILLAHeavy weapons / breach support██████ [SEALED]
SHARKWet work / intelligence recovery †██████ [SEALED]
EAGLESniper / overwatch██████ [SEALED]
Identities sealed. † Compartmented addendum applies (SHARK) — restricted to command-level review. Roles indicative; final assignment at deployment.
BLOODHOUND/PRE · PAGE 06
PRE-DEPLOYMENT
SECTION 07 // CONCEPT OF OPERATIONS
Concept of Operations

BLOODHOUND is executed in phases. Specific timings, drop points, and routing are compartmented. Each phase is gated; failure of a gate reverts to contingency.

PHASEACTION
01 · STAGINGFinal briefing, equipment, and demolition stores issued aboard USS Judas.
02 · OPENING STRIKEAV insertion to the Arasaka-aligned power facility; demolition placed; output degraded; blackout induced to degrade local control and cover movement. Shaping move.
03 · EXPLOITATIONLocal militant activity anticipated under blackout; MSTF-9 redeploys deeper into Belém by AV under cover of the disruption, fighting through to the coast.
04 · FACILITY ASSAULTBreach of the concealed submarine pen; entry and placement of demolition throughout the structure and against the berthed submarines.
05 · COLLAPSEStructural demolition to collapse the pen and render the submarines and any assets within destroyed. This is the objective.
06 · RECOVERYAV recovery to USS Judas. The AV holds on station for exfiltration; pickup from a designated coastal point.
BLOODHOUND/PRE · PAGE 07
PRE-DEPLOYMENT
SECTION 08 // INSERTION
Insertion Plan

Insertion is by AV from USS Judas. The flight transits at low level to the power facility for the opening strike, then conducts a second low-level insertion into Belém for the exploitation phase. The platform does not close the coast; drop points and routing are compartmented.

AV transit over a contested urban area is assessed as the highest-exposure phase of insertion. Comms degradation during the urban phase is anticipated.

METHODAV — from USS Judas
FIRST INSERTArasaka power facility (opening strike)
SECOND INSERTBelém urban (AV, under blackout)
PLATFORMHolds offshore · black-position
ROUTINGCompartmented
BLOODHOUND/PRE · PAGE 08
PRE-DEPLOYMENT
SECTION 09 // RECOVERY & CONTINGENCY
Recovery & Contingency

Recovery is by AV to USS Judas on completion of demolition. The AV flight holds on station for the task force’s exfiltration and lifts MSTF-9 from a designated coastal pickup once the pen is collapsed. A contingency fallback is held for a delayed or displaced pickup, with an alternate pickup point and an extended platform hold.

Because BLOODHOUND is a deniable tasking, no uniformed Militech force will deploy into theatre in support — recovery is organic to the task force and its AV. This is a constraint on visible support, not on extraction: the AV is committed to bring the team out. In the event of compromise the priority is a clean exfiltration to USS Judas while attribution is held; the platform maintains black-position status to receive them.

PRIMARYAV recovery to USS Judas
CONTINGENCYAlternate pickup · extended hold
AV POSTUREHolds on station for exfiltration
UNIFORMED SUPPORTNone — deniable tasking
PLATFORMBlack-position · receives recovery
BLOODHOUND/PRE · PAGE 09
PRE-DEPLOYMENT
SECTION 10 // RISK
Risk Factors

Principal risk factors are pre-deployment assessments. Arasaka intelligence on the maritime facility is incomplete; the assessment that response is containable rests on partial data.

  • Arasaka response capability — significant but containable
  • Augmented / cybernetic Arasaka security — reported, not confirmed; not excluded
  • Militant uprising — escalation beyond planned thresholds assessed LOW · [REDACTED]
  • Strategic weapons capability at the facility — UNVERIFIED
  • AV transit over contested urban terrain — high exposure
  • Handling risk — demolition stores
  • Brazilian governmental notification — NOT AUTHORIZED
  • Militech attribution risk — EXTREME
BLOODHOUND/PRE · PAGE 10